Tuesday, April 26, 2011

A2 - Grader's Comments

  •  For teamwork evaluations: please remember to include meaningful evaluation of your own work and the work of your team members. Simply listing each member’s contribution does not evaluate the work produced.
  • For teamwork evaluations: most students did not include their group number and/or the names of their team members.
  • None of the teams submitted their information on BBVista? - This was due to Prof. Mitchell's error - points will be restored
  • Architectural drawings exist but are not explicitly labeled or appropriately elaborated.
    • a.      Floor plan ‘images’ are not architectural drawing plans
    • b.      Section views are not perpendicular
    • c.       Sources are not referenced- remember to always give your sources credit
    • d.      Discuss drawings as they are presented
      • Why did you select that image or drawing in particular?
      • What does the image or drawing represent?
      • What is important about it?
  • Architectural discussion brief and lacking supporting details. Please try to use images and drawings in the discussion section.
  • Structural section load path diagrams were vague and did not adequately represent how loads would be transferred throughout the building (not just the exterior walls!).
  •   Calculations generally do not have correct sig figs and/or correct units.
  • It was apparent that a few groups did not read the HVAC section assignment requirements.
  • Every group attempted the extra credit.
  • Evaluate accomplishments section was overall very good!

No comments:

Post a Comment