A2 - Grader's Comments
- For teamwork evaluations: please remember to include meaningful evaluation of your own work and the work of your team members. Simply listing each member’s contribution does not evaluate the work produced.
- For teamwork evaluations: most students did not include their group number and/or the names of their team members.
- None of the teams submitted their information on BBVista? - This was due to Prof. Mitchell's error - points will be restored
- Architectural drawings exist but are not explicitly labeled or appropriately elaborated.
- a. Floor plan ‘images’ are not architectural drawing plans
- b. Section views are not perpendicular
- c. Sources are not referenced- remember to always give your sources credit
- d. Discuss drawings as they are presented
- Why did you select that image or drawing in particular?
- What does the image or drawing represent?
- What is important about it?
- Architectural discussion brief and lacking supporting details. Please try to use images and drawings in the discussion section.
- Structural section load path diagrams were vague and did not adequately represent how loads would be transferred throughout the building (not just the exterior walls!).
- Calculations generally do not have correct sig figs and/or correct units.
- It was apparent that a few groups did not read the HVAC section assignment requirements.
- Every group attempted the extra credit.
- Evaluate accomplishments section was overall very good!
No comments:
Post a Comment